PLANNING PERIOD: The period of time in which a firm selects the profit-maximizing plant size in the long run when all inputs, especially capital, are variable. This is, in other words, another term for the long run, but applied to the adjustment using the long-run average cost curve. See also | long-run average cost curve | planning curve | long-run equilibrium | variable input | plant |